Adi Husada Hospital
SES acted as the project lead responsible for energy audits, engineering design, and implementation of newly optimized and efficient equipment for the hospital. The equipment was paid for via a Shared Savings contract whereby SES invested their money and SES and Adi Husada shared in the savings over a 5 year period.
At the end of the 5-year contract all assets were transferred to the hospital and the hospital is now recieving 100% of the energy savings for the rest of the equipment life (estimated 15 years).
See detailed Case Study of the Adi Husada Shared-Saving Project here